本片是一部美国片,上映于2026-07-10,由导演,由Justin Styer/伊隆·马斯克/Tim Southerton主演。
剧情简介:Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
地区:美国
演员:Justin Styer / 伊隆·马斯克 / Tim Southerton / Bobby Peden / Jenna Lowe / Graham Kersey / Suren Sanai / Austin Dunbar / Thomas Burghardt